As part of the station's barrier-free redesign, AREP architects designed a new metal bridge, connecting the platforms of tracks 1 and 2.
The sides of the bridge as well as the stairways are clad with architectural wire mesh EGLA-DUO 4222. For the entire cladding rectangular, trapezoidal and wire mesh frames in special form were manufactured for a precise fit.
For more information, please visit our project page.
Project page.